SAMPLE REPORT. Public mine used to show the report format; not a customer deliverable and not an assessment of the operator.
Monitor · satellite evidence of change

Monitor report: Çöpler gold mine, Erzincan (public operating mine)

SiteÇöpler gold mine, Erzincan (public operating mine)
Area2,496.7 ha
Period2023-Q1 – 2024-Q4
Scenes used8
Not yet reviewed by a geologist. Do not share outside your team.
Measured areas, alerts and the change map are hidden in this public sample. A customer report shows them in full.

Summary

7 usable periods of 8. Disturbed ground inside the site went from •••.• ha to •••.• ha; within 2 km outside from •••.• ha to •••.• ha.

Alerts

Change over time

•••••••••2023-Q12023-Q22023-Q32023-Q42024-Q12024-Q22024-Q32024-Q4

━ inside   ━ within 2 km outside

PeriodScene dateValid areaDisturbed inside (ha)Disturbed within 2 km outside (ha)Water (ha)Vegetation (NDVI, buffer)
2023-Q12023-02-145% · low data quality, not used ————
2023-Q22023-05-0595% •••.••••.•••.••.••
2023-Q32023-09-1996% •••.••••.•••.••.••
2023-Q42023-12-1876% •••.••••.••••.••.••
2024-Q12024-03-3079% •••.••••.••••.••.••
2024-Q22024-04-1696% •••.••••.•••.••.••
2024-Q32024-09-2696% •••.••,•••.•••.••.••
2024-Q42024-11-0295% •••.••••.•••.••.••

S2B_MSIL2A_20230214T082009_R121_T37SDD_20240816T003223 · S2B_MSIL2A_20230505T081609_R121_T37SDD_20230505T125910 · S2B_MSIL2A_20230919T080609_R078_T37SDD_20241031T145014 · S2B_MSIL2A_20231218T081249_R078_T37SDD_20231220T092744 · S2B_MSIL2A_20240330T081609_R121_T37SDD_20240330T115155 · S2B_MSIL2A_20240416T080609_R078_T37SDD_20240416T111834 · S2B_MSIL2A_20240926T081619_R121_T37SDD_20240926T112013 · S2B_MSIL2A_20241102T081009_R078_T37SDD_20241102T093844

Change map

Change map

Red: new disturbance between the first and last usable period. Blue: disturbance removed or recovered. The image covers the site and a 2 km buffer.

Method

What this report does and does not show

OreRank · Monitor · every figure comes from the listed satellite scenes and the method version above. · 2026-10-18